Dairies and beverage plants have every load solar likes and one it must respect: continuous refrigeration. Designed together, the array carries the line by day and the battery carries the chillers by night.
Key facts
- Pasteurisers, homogenisers, fillers and compressors: daytime loads suited to solar directly.
- Milk and product chillers: continuous loads that set the overnight battery.
- Cold rooms of 10–50 tonnes at +2 to +8 °C sit under the same contract as the plant.
- Typical saving: 20–30% of today's diesel plus grid bill, with a silent, flicker-free plant.
Load by hour
Morning: chillers hard as milk arrives. Day: processing line at full tilt. Evening: line off, chillers and cold rooms holding. Solar covers the first two; the battery, sized at 60–70% of daytime load for 12 hours, covers the third. Grid or gas covers the exceptional week.
Quality and records
Product recalls start with a temperature excursion nobody saw. Every FBE cold room and chiller is logged with alarms, and monthly reports give quality managers and buyers the record they need.
Financing
Beverage groups often earn naira; a single large plant or two sites under one contract usually clears the US$1M equipment floor for a currency-protected service contract. Smaller dairies buy outright.
Run a dairy or beverage plant? Ask for the load assessment.
Talk to Frontières BayFrequently asked
Can you power our boilers?
Steam boilers are usually gas or biomass; solar covers the electrical load. Heat-pump options are assessed at the audit.
How long does installation take?
10–14 weeks from order; changeover on a planned shutdown.